We are encouraging people resident in Winchester and the surrounding area to comment in support of this planning application. 

How to comment or renew your support

  • Search for Reference 24/02804/FUL on the City Council’s planning portal. Register first if you haven’t done so before. 
  • Click the ‘Comments’ tab on the screen, fill in your details and click ‘support’ where it asks for a stance. 
  • Post your comment in the text box as directed – you are welcome to copy and paste some of the information from this webpage if it makes it easier.

You are free to leave any comments you wish. If you’re unsure what to say you could mention:

  • the declaration of a climate emergency by Winchester City Council
  • the biodiversity net gain in the area if the solar farm is installed
  • that the biggest threat to our landscapes is the effects of climate change. Locally that means increased flooding and crop failure. 

We know that many people across the Winchester area support solar farms. They think solar farms are an important part of the mix of renewable energy we need to help prevent further pollution to our environment by the use of fossil fuels. 

This is your chance to ensure your voice is heard.

The deadline for comments is Monday 5 May 2025.

Further information about this planning application  

About the solar farm

How much energy it will provide: 49.9 MW which is enough to power 11,900 Winchester district homes.

Land area of panels: 63 hectares..

Grid connection: A grid connection will be made in field 10. A new substation will be located in field 10 to enable this connection.

Duration: Operational lifespan of 40 years after which the the solar farm and associated infrastructure will be decommissioned, dismantled and removed. 

WinACC response to the plans for the Titchfield Lane solar farm

WinACC supports this planning application. 

The developers contacted us several months ago to advise of their interest in the location of their proposal for this solar farm. At 50Mw this represents a much-needed contribution to the renewable energy generation of the district and the ambition of a decarbonised electricity grid by 2030.  We have had conversations with the applicant and visited the exhibition at Wickham Village Community Centre . The applicant proposes four locations for this solar farm within the same vicinity which appears to fit well with the landscape and existing hedgerow screening. This separation reduces the overall visual impact of this large solar farm and one of those locations involves extending, in four directions, the existing smaller Raglington solar farm which is a good use of an existing connection point to the national grid.  

We are also satisfied the applicant has taken account of the public right of way in submitting this application, to maintain amenity access for walkers. Whilst there is some impact on walkers of one of the locations, it is only a short distance where they would experience solar panels on both side of the path and not material in the context of the overall experience of walkers across this area of countryside. We are also satisfied that the proposed development is planned to achieve greater than the mandatory requirement in offering a 23.41% Biodiversity Net Gain (BNG) associated with habitat units and 63.53% Biodiversity Net Gain associated with hedgerow units. We have seen greater BNG than this with other applications though note the existing fields are currently in grassland pasture (rather than used to grow cereals or other food crops) and that grassland pasture has a similar BNG credit value to the post construction grassland proposed by the applicant under the solar array once operational. We were pleased to see the proposed development does offer other biodiversity improvements including bat/bird boxes and additional tree planting which are not a calculated part of the BNG matrix.

We are satisfied that the applicant has consulted with the local community, including the relevant PCs, and it was evident from the exhibition we attended that there had been little negative feedback received at that time. The developer has assured us that they have proposed a community fund and have been in dialogue with representatives of the local community regarding the nature of that.

Some of the roads in the vicinity are quite narrow and it is evident that the applicant had carefully considered this in their construction plan proposals with one main delivery site to accommodate the larger deliveries to the area, mostly in the first six weeks, to avoid an extended period of disruption to local residents. The applicant plans to communicate with local neighbours about larger deliveries to the site so that neighbouring properties know what to expect and when. 

In the context of agricultural land being used for solar farms the general rule is one of the avoidance, where possible, of the use higher quality agricultural land, i.e., “Best and Most Versatile”. Most of the area proposed is Grade 3b or less and it is notable that the vast majority of existing use is grass pasture, i.e., livestock farming, which reflects the lesser opportunity and productive capability of this land to grow grains, pulses or oilseeds for human consumption. Whilst the location of solar panels would prevent the use of cattle grazing, there would still be opportunities for grazing sheep under the panels which happens on other solar farms. We know that sheep grazing can also be very useful for conservation grazing of mixed species grassland under solar panels, especially when used on a rotational basis, i.e., sheep are removed for periods of time to allow flowering plants to bloom, providing nectar for insects.  

Relevant documents from the planning application:

These summary notes offer quick reference to matters of particular importance. They are extracts copied from hundreds of pages of reports and are not presented as a substitute for them. The title of the relevant report is shown in italics. Apart from the topics summarised here, the reports include assessments relating to heritage, archaeology and flood risk. The Design and Access Statement provides a useful overall description in reader-friendly language and presentation.

Landscape and visual impact

(extracts from the summary section of the Landscape and Visual Impact Assessment)

Measures have been incorporated into the design of the Proposed Development to reduce potential impacts and improve the existing landscape structure within the Site. S ome existing vegetation along the Site’s boundaries would need be removed, totaling 12 m of hedgerow, 15 trees (including three trees covered by a TPO), and 11 standing dea d trees (including one tree covered by a TPO). The landscape mitigation proposals, ho wever, would create a rich variety of landscape features, drawing on existing landscape features and the character of the surrounding landscape. The landscape mitigation proposals would add to the amenity of the Site and enhance its biodiversity. The landscape mitigation proposals include the creation of: over 2.2 km of hedgerow; over 1.1 ha of native tree and shrub or scrub; over 55 ha of grassland (tussocky, neutral or modified, some with wildflowers); and stretches of hedgerow tree or tree-belt planting. In addition, over 1.1 km of existing hedgerow would be improved through gapping-up or hedge tree planting; and a relic pond would be reinstated. 

The assessment concludes that there is capacity for the landscape to accommodate the Proposed Development without causing significant landscape harm to the surrounding area. Beyond the immediate vicinity of the Site, visual effects arising as a consequence of the Proposed Development would be limited in scale and extent, and most visual effects would reduce over time as the proposed mitigation planting matures. The effects would be reversible with the removal of the Proposed Development and the reinstatement of present land management. Retention of proposed landscape planting beyond the operational phase of the solar scheme would be expected to have enduring benefits for local landscape character.

Agriculture

(extract from the Agricultural Land Classification).

.……the grading of the application site being:

Grade 3a:   39%

Grade 3b: 34%

Grade 4: 22%

Other/non-agricultural (buildings,hard standing, roads): 5%

WinACC footnote: we have produced a short video on the relationship between solar farms and food security, Solar farms: A win-win for farmers, food and energy.

Biodiversity

(extracts from the Summary section of the Ecological Impact Assessment)

The assessment site comprises 3.09km of hedgerow features. Proposals result in enhancement of 0.545km of existing hedgerow through planting up with additional woody species, and the creation of 2.353km of additional species rich hedgerow. This will provide a 76% increase in hedgerow habitat, one of the most important features for foraging bats in the landscape. 

The assessment site comprises 37.5092ha of arable land of negligible value for foraging bats due to intensive management. This will be replaced with 31.6155ha of sheep grazed grassland, 4.4198ha of species rich grassland and 1.341ha of mixed scrub. It is likely that habitat creation, with proper management, would result in increased insect numbers for the benefit of local bat populations. 

Assessment: Changes in land management make it is near-certain that the development will have no adverse effect on this receptor for the period of its operation. An effect, were it to occur, would minor, positive and permanent for the period of operation.

You can make a difference

Anyone with an interest in clean energy and enthusiasm for creating real positive change is welcome to join WinACC’s Renewable Energy Action Group. The group usually meets online, on Tuesday evenings, roughly once every 6 weeks. Please get in touch if you’d like to find out more, or to arrange a taster session. Just email contactus@winacc.org.uk or leave a message on our office phone 01962 827083 and someone will get back to you as quickly as possible.