Solar support: Littleton Memorial Hall

Littleton Memorial Hall Retrofitting for Sustainability

Littleton Memorial Hall was built in 1999 with Millennium Commission funding and cash raised from local fundraising efforts. In 2021 the Hall Trustees were keen to undergo a process of retrofit in order to make the hall more energy efficient and cheaper to run, and also to contribute to addressing the climate crisis by decarbonising energy usage.

39 Solar PV panels were installed by C2 Renewable Solutions in April 2022 at a cost of £9,600, all of which was self-funded.

Tesla Powerwall battery installed November 2023 using a grant (Parish and Town Council Investment Fund) from HCC at a cost of £10,740. The grant was specifically for decarbonisation rather than reducing energy bills. Contact at HCC was Lisa Wood. She encouraged them to have an energy survey, in fact it was compulsory, and HCC paid for it (£1,740). Focus Green did the survey, and came back with four recommendations:

  1. Battery – selected this option.
  2. LED lighting – selected this option.
  3. New central heating system – rejected this option as too expensive (>£40k) and disruptive because the floors would have had to be taken up.
  4. Sub-metering of the hall – rejected this option because the hall isn’t big enough for this to be sensible.

The primary usage of electricity is for heating the main rooms.

Installation happened 2022-23 and the metrics show a considerable improvement to bills. There is a marked change in this time despite returning from Covid and the increase in usage after all of that, as can be seen below:-

YearkWh electricity usedComments
201928,128The last pre-Covid year
202126,735Hall only partially open in the early months
202218,635Solar panels installed April 2022
202316,022Battery installed November 2023

The 2023 usage is 43% below the 2019 level, which is very significant, and is expected to fall even further in 2024 with the full year effect of the battery.

They have an app that shows how much electricity is being generated, stored or taken from the grid continuously.

Next steps:

They were unable to benefit initially from Smart Energy Guarantee Income for electricity fed from the solar panels to the national grid because smart meters were not available for 3 phase electricity supplies, so they have lost income – same as Itchen Abbas. However, smart meters did become available in 2023 and were installed in August that year, but registration with MCS and that took some time, so the system was finally registered in December 2023.  The good thing is they got a good export rate 16p, but they only get paid once a year and that is by cheque. They will get the first payment in December 2024