A lot has happened since plans were first announced to widen the M3 near Junction 9 at Winchester. The Government, Hampshire County Council, Winchester City Council and Eastleigh Borough Council have all declared a climate emergency. The Intergovernmental Panel on Climate Change has told us repeatedly that unless we reduce our emissions drastically by 2030, a cycle of unstoppable global heating will destroy not only our way of life but also most of the natural environment.
Road traffic already causes over half of Winchester’s harmful greenhouse gas emissions that lead to worsening of the climate crisis.
Winchester Action on the Climate Crisis would like National Highways to abandon the plans to widen the M3 around Winchester.
We’ve looked in detail at what National Highways estimate woiuld be the amount of time saved on a journey through Winchester, if this junction 9 widening were to take place. The estimates are a forecast for 2047, after the work has finished and traffic patterns are applied. They estimate the journey, at that time, will save approximately 20 seconds, compared to if they do not do the widening at all. It therefore makes no sense to spend over £150m on this project.
We also can’t tell, from the documentation, how far National Highways have taken into account the requirement to cut harmful greenhouse gas emissions in transport from the Government’s Road to Net Zero document.
Read our detailed critique which has gone to the Examination of the application by National Highways.
We must not forget we are in a climate emergency.
Renewable energy, when it is fully available, must be used wisely. It is likely that road traffic will go electric in the future; however the renewable electricity will be needed for more than just private cars. We would suggest it is better used on good public transport.
Better ways of reducing congestion

We have spent time looking at better ways of tackling congestion at Junction 9 that will also reduce the production of harmful emissions, they include:
- Developing a network of fast Winchester District bus routes to encourage people to keep their cars off the M3
- Creating a good bus/train interchange at Winchester railway station
- Developing a network of bus feeder services to Southampton suburban stations for connections to Winchester and Basingstoke
- Building a railway station at North Whiteley
- Increasing the capacity of the railway line through Winchester, so it can play a greater part in catering for those commuting into Winchester, especially from the Solent area
- Improving frequency and connections on the whole of the south Hampshire rail network
- Electrifying the railway line from Didcot to Birmingham and Nuneaton to encourage the transfer of lorry traffic to low carbon low energy goods train services from Southampton Docks to national distribution points in the Midlands
- Developing a rail-connected goods distribution hub in the north Solent area (Eastleigh or Micheldever?) to divert traffic to proposed rail-based distribution networks
- Building a district-wide safe cycle network.